Feature #45
Reports--Summary subset
| Status: | New | Start: | 09/07/2009 | |
| Priority: | Normal | Due date: | ||
| Assigned to: | - | % Done: | 0% |
|
| Category: | - | |||
| Target version: | - | |||
| Vote: | 0 |
Description
I have Projects with 8 Tasks; When creating a report either in Chart or Text, would it be possible to have the Summary creat a % subset of the Tasks?
Example:
Summary (Tasks per Project)___________________
Consulting (39.6%)
+ Task 1 (12%)<<<<<<<<Needed totals
+ Task 2 (12%)<<<<<<<<
+ Task 3 (15.6%)<<<<<<
In this way, if I choose Chart; and filter to "Consulting" the pie will show me each individual task % subset total.
History
Updated by Parrish Mooneyham 366 days ago
Dr Dude wrote:
I have Projects with 8 Tasks; When creating a report either in Chart or Text, would it be possible to have the Summary creat a % subset of the Tasks? Example: Summary (Tasks per Project)___________________ Consulting (39.6%) + Task 1 (12%)<<<<<<<<Needed totals + Task 2 (12%)<<<<<<<< + Task 3 (15.6%)<<<<<<
In this way, if I choose Chart; and filter to "Consulting" the pie will show me each individual task % subset total.
I second this Feature, it will be very useful in looking at the Project breakdown on where the time went for each task in a Project. Thx for entering this Dr Dude :D...